FAU 818 over Sugar Creek
GoodChester County, Tennessee · In Henderson City Limits · Structure no. 12008180001
- Built
- 2007
- 18 years old
- Condition
- Good
- inspected June 2023
- Type
- Culvert
- Concrete Continuous
- Length
- 57 ft
- 3 main spans
- Daily traffic
- 1,665
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
FAU 818 over Sugar Creek is a concrete continuous culvert carrying FAU 818 over Sugar Creek in Chester County, Tennessee. It was built in 2007, so it is 18 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,665 vehicles a day, roughly 3% of them trucks, projected to reach 2,405 by 2041. The structure is 57 ft (17.3 m) long and 47 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU 818 over Sugar Creek built?
It was built in 2007, making it 18 years old in 2025.
What condition is FAU 818 over Sugar Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does FAU 818 over Sugar Creek carry?
About 1,665 vehicles per day (2021 count), of which roughly 3% are trucks.
How long is FAU 818 over Sugar Creek?
The structure is 57 ft (17.3 m) long with a longest span of 18 ft (5.5 m) and a deck 47 ft wide.
Who owns FAU 818 over Sugar Creek?
It is owned by the City or Municipal Highway Agency.