US Bridges

Sc 22 Ebl over Ma RR

Good

Horry County, South Carolina · 6MI N of Conway · Structure no. 000000000009677

Built
2000
25 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
161 ft
3 main spans
Daily traffic
7,000
2023 count
Owner
State
State Highway Agency

About this bridge

Sc 22 Ebl over Ma RR is a prestressed concrete stringer/multi-beam or girder carrying Sc 22 Ebl over Ma RR in Horry County, South Carolina. It was built in 2000, so it is 25 years old, younger than the South Carolina average of 48 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,000 vehicles a day, roughly 8% of them trucks, projected to reach 12,180 by 2043. The structure is 161 ft (49 m) long and 41 ft wide.

CarriesSc 22 Ebl
CrossesMa RR
Location6MI N of Conway
RouteState Highway 22
Coordinates33.94383, -79.01946
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66 US tons
Inventory rating39.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length161 ft (49 m)
Longest span80 ft (24.4 m)
Deck width41 ft (12.5 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,000 (2023)
Projected traffic12,180 by 2043
Trucks8%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Sc 22 Ebl over Ma RR built?

It was built in 2000, making it 25 years old in 2025.

What condition is Sc 22 Ebl over Ma RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Sc 22 Ebl over Ma RR carry?

About 7,000 vehicles per day (2023 count), of which roughly 8% are trucks.

How long is Sc 22 Ebl over Ma RR?

The structure is 161 ft (49 m) long with a longest span of 80 ft (24.4 m) and a deck 41 ft wide.

Who owns Sc 22 Ebl over Ma RR?

It is owned by the State Highway Agency.