US Bridges

C-26-701 over Trib to Poplar Swamp

FairPosted for load

Horry County, South Carolina · 6.2 MI NE of Conway · Structure no. 000000000009571

Built
2001
24 years old
Condition
Fair
inspected November 2023
Type
Slab
Concrete
Length
30 ft
2 main spans
Daily traffic
250
2023 count
Owner
County
County Highway Agency

About this bridge

C-26-701 over Trib to Poplar Swamp is a concrete slab carrying C-26-701 over Trib to Poplar Swamp in Horry County, South Carolina. It was built in 2001, so it is 24 years old, younger than the South Carolina average of 48 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 250 vehicles a day, roughly 5% of them trucks, projected to reach 320 by 2043. The structure is 30 ft (9.1 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesC-26-701
CrossesTrib to Poplar Swamp
Location6.2 MI NE of Conway
RouteCounty Highway 701
Coordinates33.9372, -79.01298
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating27.9 US tons
Inventory rating16.8 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckWood or timber
Main spans2
Design loadUnknown
Structure length30 ft (9.1 m)
Longest span15 ft (4.6 m)
Deck width28 ft (8.4 m)
Roadway width24 ft (7.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic250 (2023)
Projected traffic320 by 2043
Trucks5%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was C-26-701 over Trib to Poplar Swamp built?

It was built in 2001, making it 24 years old in 2025.

What condition is C-26-701 over Trib to Poplar Swamp in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does C-26-701 over Trib to Poplar Swamp carry?

About 250 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is C-26-701 over Trib to Poplar Swamp?

The structure is 30 ft (9.1 m) long with a longest span of 15 ft (4.6 m) and a deck 28 ft wide.

Who owns C-26-701 over Trib to Poplar Swamp?

It is owned by the County Highway Agency.