Off Pr 372 0.2 KM over Duey River
PoorPosted for loadYauco Municipio, Puerto Rico · Off Pr 372 at 7.1 KM 0.2 · Structure no. 025731
- Built
- 1988
- 37 years old
- Condition
- Poor
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 42 ft
- 1 main span
- Daily traffic
- 2,200
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Off Pr 372 0.2 KM over Duey River is a steel stringer/multi-beam or girder carrying Off Pr 372 0.2 KM over Duey River in Yauco Municipio, Puerto Rico. It was built in 1988, so it is 37 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 2,200 vehicles a day, roughly 2% of them trucks, projected to reach 3,200 by 2025. The structure is 42 ft (12.9 m) long and 18 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Off Pr 372 0.2 KM over Duey River built?
It was built in 1988, making it 37 years old in 2025.
What condition is Off Pr 372 0.2 KM over Duey River in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in February 2024.
How much traffic does Off Pr 372 0.2 KM over Duey River carry?
About 2,200 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Off Pr 372 0.2 KM over Duey River?
The structure is 42 ft (12.9 m) long with a longest span of 37 ft (11.2 m) and a deck 18 ft wide.
Who owns Off Pr 372 0.2 KM over Duey River?
It is owned by the City or Municipal Highway Agency.