Off Pr 372 2.5 KM over Duey River
PoorPosted for loadYauco Municipio, Puerto Rico · 3KM.NORTH of Yauco · Structure no. 025721
- Built
- 1993
- 32 years old
- Condition
- Poor
- inspected March 2025
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 50 ft
- 2 main spans
- Daily traffic
- 2,200
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Off Pr 372 2.5 KM over Duey River is a concrete stringer/multi-beam or girder carrying Off Pr 372 2.5 KM over Duey River in Yauco Municipio, Puerto Rico. It was built in 1993, so it is 32 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 2,200 vehicles a day, roughly 2% of them trucks, projected to reach 3,200 by 2025. The structure is 50 ft (15.1 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Off Pr 372 2.5 KM over Duey River built?
It was built in 1993, making it 32 years old in 2025.
What condition is Off Pr 372 2.5 KM over Duey River in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in March 2025.
How much traffic does Off Pr 372 2.5 KM over Duey River carry?
About 2,200 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Off Pr 372 2.5 KM over Duey River?
The structure is 50 ft (15.1 m) long with a longest span of 22 ft (6.6 m) and a deck 26 ft wide.
Who owns Off Pr 372 2.5 KM over Duey River?
It is owned by the City or Municipal Highway Agency.