Pr 22 Eastbound over LA Plata River & Pr
FairToa Baja Municipio, Puerto Rico · 2.8 KM South of Toa Baja · Structure no. 019522
- Built
- 1990
- 35 years old
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 4,199 ft
- 37 main spans
- Daily traffic
- 37,700
- 2005 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Pr 22 Eastbound over LA Plata River & Pr is a prestressed concrete stringer/multi-beam or girder carrying Pr 22 Eastbound over LA Plata River & Pr in Toa Baja Municipio, Puerto Rico. It was built in 1990, so it is 35 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 37,700 vehicles a day, roughly 5% of them trucks, projected to reach 38,003 by 2025. The structure is 4,199 ft (1,279.8 m) long and 58 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 22 Eastbound over LA Plata River & Pr built?
It was built in 1990, making it 35 years old in 2025.
What condition is Pr 22 Eastbound over LA Plata River & Pr in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Pr 22 Eastbound over LA Plata River & Pr carry?
About 37,700 vehicles per day (2005 count), of which roughly 5% are trucks.
How long is Pr 22 Eastbound over LA Plata River & Pr?
The structure is 4,199 ft (1,279.8 m) long with a longest span of 122 ft (37.1 m) and a deck 58 ft wide.
Who owns Pr 22 Eastbound over LA Plata River & Pr?
It is owned by the State Toll Authority.