Pr 693 0.5 KM over Nuevo River
FairDorado Municipio, Puerto Rico · 0.5 KM N Int PR2 & Pr · Structure no. 017961
- Built
- 1982
- 43 years old, rebuilt 2006
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 43 ft
- 1 main span
- Daily traffic
- 13,400
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 693 0.5 KM over Nuevo River is a steel stringer/multi-beam or girder carrying Pr 693 0.5 KM over Nuevo River in Dorado Municipio, Puerto Rico. It was built in 1982 and reconstructed in 2006, so it is 43 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 13,400 vehicles a day, roughly 5% of them trucks, projected to reach 17,400 by 2025. The structure is 43 ft (13 m) long and 41 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 693 0.5 KM over Nuevo River built?
It was built in 1982, making it 43 years old in 2025. It was reconstructed in 2006.
What condition is Pr 693 0.5 KM over Nuevo River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Pr 693 0.5 KM over Nuevo River carry?
About 13,400 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 693 0.5 KM over Nuevo River?
The structure is 43 ft (13 m) long with a longest span of 43 ft (13 m) and a deck 41 ft wide.
Who owns Pr 693 0.5 KM over Nuevo River?
It is owned by the State Highway Agency.