US Bridges

Pr 375 over Guayanilla River Tribu

Fair

Ponce Municipio, Puerto Rico · Yauco · Structure no. 031211

Built
2010
15 years old
Condition
Fair
inspected June 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
52 ft
2 main spans
Daily traffic
1,000
2017 count
Owner
State
State Highway Agency

About this bridge

Pr 375 over Guayanilla River Tribu is a steel stringer/multi-beam or girder carrying Pr 375 over Guayanilla River Tribu in Ponce Municipio, Puerto Rico. It was built in 2010, so it is 15 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,000 vehicles a day, projected to reach 1,300 by 2025. The structure is 52 ft (15.9 m) long and 24 ft wide.

CarriesPr 375
CrossesGuayanilla River Tribu
LocationYauco
RouteCity Street 0_
Coordinates18.09139, -66.82175
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating51.3 US tons
Inventory rating30.8 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length52 ft (15.9 m)
Longest span20 ft (6 m)
Deck width24 ft (7.3 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2017)
Projected traffic1,300 by 2025
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Pr 375 over Guayanilla River Tribu built?

It was built in 2010, making it 15 years old in 2025.

What condition is Pr 375 over Guayanilla River Tribu in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does Pr 375 over Guayanilla River Tribu carry?

About 1,000 vehicles per day (2017 count).

How long is Pr 375 over Guayanilla River Tribu?

The structure is 52 ft (15.9 m) long with a longest span of 20 ft (6 m) and a deck 24 ft wide.

Who owns Pr 375 over Guayanilla River Tribu?

It is owned by the State Highway Agency.