Pr 391 6.1 KM over Los Jobos River
FairPosted for loadPenuelas Municipio, Puerto Rico · Bo. Rusio of PE¥UELA · Structure no. 012931
- Built
- 1955
- 70 years old
- Condition
- Fair
- inspected August 2024
- Type
- Tee Beam
- Concrete
- Length
- 39 ft
- 1 main span
- Daily traffic
- 7,200
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 391 6.1 KM over Los Jobos River is a concrete tee beam carrying Pr 391 6.1 KM over Los Jobos River in Penuelas Municipio, Puerto Rico. It was built in 1955, so it is 70 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 7,200 vehicles a day, roughly 2% of them trucks, projected to reach 10,400 by 2025. The structure is 39 ft (12 m) long and 20 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 391 6.1 KM over Los Jobos River built?
It was built in 1955, making it 70 years old in 2025.
What condition is Pr 391 6.1 KM over Los Jobos River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Pr 391 6.1 KM over Los Jobos River carry?
About 7,200 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Pr 391 6.1 KM over Los Jobos River?
The structure is 39 ft (12 m) long with a longest span of 34 ft (10.3 m) and a deck 20 ft wide.
Who owns Pr 391 6.1 KM over Los Jobos River?
It is owned by the State Highway Agency.