Calle 7 0.4 KM over Quebrada Ceiba
FairPosted for loadPenuelas Municipio, Puerto Rico · _ · Structure no. 030911
- Built
- 2019
- 6 years old
- Condition
- Fair
- inspected October 2023
- Type
- Tee Beam
- Concrete
- Length
- 55 ft
- 1 main span
- Daily traffic
- 900
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Calle 7 0.4 KM over Quebrada Ceiba is a concrete tee beam carrying Calle 7 0.4 KM over Quebrada Ceiba in Penuelas Municipio, Puerto Rico. It was built in 2019, so it is 6 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 900 vehicles a day, roughly 2% of them trucks, projected to reach 1,056 by 2025. The structure is 55 ft (16.8 m) long and 28 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Calle 7 0.4 KM over Quebrada Ceiba built?
It was built in 2019, making it 6 years old in 2025.
What condition is Calle 7 0.4 KM over Quebrada Ceiba in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Calle 7 0.4 KM over Quebrada Ceiba carry?
About 900 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Calle 7 0.4 KM over Quebrada Ceiba?
The structure is 55 ft (16.8 m) long with a longest span of 50 ft (15.2 m) and a deck 28 ft wide.
Who owns Calle 7 0.4 KM over Quebrada Ceiba?
It is owned by the City or Municipal Highway Agency.