Off Pr 167 5.6 KM over Mula Creek
FairPosted for loadNaranjito Municipio, Puerto Rico · 3.3 KM South Int Pr 164 · Structure no. 003731
- Built
- 1908
- 117 years old, rebuilt 1958
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 50 ft
- 1 main span
- Daily traffic
- 6,000
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Off Pr 167 5.6 KM over Mula Creek is a steel stringer/multi-beam or girder carrying Off Pr 167 5.6 KM over Mula Creek in Naranjito Municipio, Puerto Rico. It was built in 1908 and reconstructed in 1958, so it is 117 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 6,000 vehicles a day, roughly 4% of them trucks, projected to reach 7,200 by 2025. The structure is 50 ft (15.1 m) long and 23 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Off Pr 167 5.6 KM over Mula Creek built?
It was built in 1908, making it 117 years old in 2025. It was reconstructed in 1958.
What condition is Off Pr 167 5.6 KM over Mula Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Off Pr 167 5.6 KM over Mula Creek carry?
About 6,000 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Off Pr 167 5.6 KM over Mula Creek?
The structure is 50 ft (15.1 m) long with a longest span of 50 ft (15.1 m) and a deck 23 ft wide.
Who owns Off Pr 167 5.6 KM over Mula Creek?
It is owned by the State Highway Agency.