Pr 164 4.1 KM over Anones Creek
FairNaranjito Municipio, Puerto Rico · 2 KM East of Naranjito · Structure no. 003631
- Built
- 1913
- 112 years old
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 32 ft
- 1 main span
- Daily traffic
- 2,300
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 164 4.1 KM over Anones Creek is a steel stringer/multi-beam or girder carrying Pr 164 4.1 KM over Anones Creek in Naranjito Municipio, Puerto Rico. It was built in 1913, so it is 112 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,300 vehicles a day, roughly 5% of them trucks, projected to reach 3,300 by 2025. The structure is 32 ft (9.9 m) long and 24 ft wide. If it were closed, the detour would be 16.8 mi (27 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 164 4.1 KM over Anones Creek built?
It was built in 1913, making it 112 years old in 2025.
What condition is Pr 164 4.1 KM over Anones Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Pr 164 4.1 KM over Anones Creek carry?
About 2,300 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 164 4.1 KM over Anones Creek?
The structure is 32 ft (9.9 m) long with a longest span of 32 ft (9.9 m) and a deck 24 ft wide.
Who owns Pr 164 4.1 KM over Anones Creek?
It is owned by the State Highway Agency.