Pr 155 46.3 KM over Morovis River
FairMorovis Municipio, Puerto Rico · 1 KM South of Morovis · Structure no. 003341
- Built
- 1940
- 85 years old
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 47 ft
- 1 main span
- Daily traffic
- 6,000
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 155 46.3 KM over Morovis River is a steel stringer/multi-beam or girder carrying Pr 155 46.3 KM over Morovis River in Morovis Municipio, Puerto Rico. It was built in 1940, so it is 85 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,000 vehicles a day, roughly 4% of them trucks, projected to reach 7,800 by 2025. The structure is 47 ft (14.4 m) long and 26 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 155 46.3 KM over Morovis River built?
It was built in 1940, making it 85 years old in 2025.
What condition is Pr 155 46.3 KM over Morovis River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Pr 155 46.3 KM over Morovis River carry?
About 6,000 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Pr 155 46.3 KM over Morovis River?
The structure is 47 ft (14.4 m) long with a longest span of 47 ft (14.4 m) and a deck 26 ft wide.
Who owns Pr 155 46.3 KM over Morovis River?
It is owned by the State Highway Agency.