Pr 2 Westb 53.2 KM over Grande De Manati River
FairManati Municipio, Puerto Rico · 4 KM West of Manati · Structure no. 010492
- Built
- 1968
- 57 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,010 ft
- 15 main spans
- Daily traffic
- 10,600
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 2 Westb 53.2 KM over Grande De Manati River is a prestressed concrete stringer/multi-beam or girder carrying Pr 2 Westb 53.2 KM over Grande De Manati River in Manati Municipio, Puerto Rico. It was built in 1968, so it is 57 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,600 vehicles a day, roughly 4% of them trucks, projected to reach 14,950 by 2025. The structure is 1,010 ft (308 m) long and 36 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 2 Westb 53.2 KM over Grande De Manati River built?
It was built in 1968, making it 57 years old in 2025.
What condition is Pr 2 Westb 53.2 KM over Grande De Manati River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Pr 2 Westb 53.2 KM over Grande De Manati River carry?
About 10,600 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Pr 2 Westb 53.2 KM over Grande De Manati River?
The structure is 1,010 ft (308 m) long with a longest span of 68 ft (20.6 m) and a deck 36 ft wide.
Who owns Pr 2 Westb 53.2 KM over Grande De Manati River?
It is owned by the State Highway Agency.