Pr 2 50.3 KM over Waterway
FairManati Municipio, Puerto Rico · 1.5 KM West of Manati · Structure no. 000401
- Built
- 1945
- 80 years old, rebuilt 1973
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete Continuous
- Length
- 94 ft
- 3 main spans
- Daily traffic
- 25,000
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 2 50.3 KM over Waterway is a concrete continuous stringer/multi-beam or girder carrying Pr 2 50.3 KM over Waterway in Manati Municipio, Puerto Rico. It was built in 1945 and reconstructed in 1973, so it is 80 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 25,000 vehicles a day, roughly 5% of them trucks, projected to reach 31,500 by 2025. The structure is 94 ft (28.6 m) long and 92 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 2 50.3 KM over Waterway built?
It was built in 1945, making it 80 years old in 2025. It was reconstructed in 1973.
What condition is Pr 2 50.3 KM over Waterway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Pr 2 50.3 KM over Waterway carry?
About 25,000 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 2 50.3 KM over Waterway?
The structure is 94 ft (28.6 m) long with a longest span of 37 ft (11.2 m) and a deck 92 ft wide.
Who owns Pr 2 50.3 KM over Waterway?
It is owned by the State Highway Agency.