Pr 52 Nobd 91.1 KM over Pr 149 68.4 KM
FairJuana Diaz Municipio, Puerto Rico · 2 KM S S W of Juana Diaz · Structure no. 011442
- Built
- 1971
- 54 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 164 ft
- 1 main span
- Daily traffic
- 17,900
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 52 Nobd 91.1 KM over Pr 149 68.4 KM is a prestressed concrete stringer/multi-beam or girder carrying Pr 52 Nobd 91.1 KM over Pr 149 68.4 KM in Juana Diaz Municipio, Puerto Rico. It was built in 1971, so it is 54 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 17,900 vehicles a day, roughly 5% of them trucks, projected to reach 25,050 by 2025. The structure is 164 ft (50 m) long and 47 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 52 Nobd 91.1 KM over Pr 149 68.4 KM built?
It was built in 1971, making it 54 years old in 2025.
What condition is Pr 52 Nobd 91.1 KM over Pr 149 68.4 KM in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Pr 52 Nobd 91.1 KM over Pr 149 68.4 KM carry?
About 17,900 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 52 Nobd 91.1 KM over Pr 149 68.4 KM?
The structure is 164 ft (50 m) long with a longest span of 82 ft (25 m) and a deck 47 ft wide.
Who owns Pr 52 Nobd 91.1 KM over Pr 149 68.4 KM?
It is owned by the State Highway Agency.