Pr 30 25.7 KM over Pr 60 0.3 KM
PoorHumacao Municipio, Puerto Rico · 2 KM Northwest of Humacao · Structure no. 012441
- Built
- 1975
- 50 years old, rebuilt 1996
- Condition
- Poor
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 206 ft
- 2 main spans
- Daily traffic
- 60,700
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 30 25.7 KM over Pr 60 0.3 KM is a prestressed concrete stringer/multi-beam or girder carrying Pr 30 25.7 KM over Pr 60 0.3 KM in Humacao Municipio, Puerto Rico. It was built in 1975 and reconstructed in 1996, so it is 50 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 60,700 vehicles a day, roughly 4% of them trucks, projected to reach 91,700 by 2025. The structure is 206 ft (62.7 m) long and 55 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 30 25.7 KM over Pr 60 0.3 KM built?
It was built in 1975, making it 50 years old in 2025. It was reconstructed in 1996.
What condition is Pr 30 25.7 KM over Pr 60 0.3 KM in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in October 2024.
How much traffic does Pr 30 25.7 KM over Pr 60 0.3 KM carry?
About 60,700 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Pr 30 25.7 KM over Pr 60 0.3 KM?
The structure is 206 ft (62.7 m) long with a longest span of 98 ft (29.9 m) and a deck 55 ft wide.
Who owns Pr 30 25.7 KM over Pr 60 0.3 KM?
It is owned by the State Highway Agency.