US Bridges

Pr 2 over Pr 377

Fair

Guayanilla Municipio, Puerto Rico · 2.5 KM N W of Guayanilla · Structure no. 027461

Built
2003
22 years old
Condition
Fair
inspected September 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
115 ft
1 main span
Daily traffic
36,900
2017 count
Owner
State
State Highway Agency

About this bridge

Pr 2 over Pr 377 is a prestressed concrete stringer/multi-beam or girder carrying Pr 2 over Pr 377 in Guayanilla Municipio, Puerto Rico. It was built in 2003, so it is 22 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 36,900 vehicles a day, roughly 5% of them trucks, projected to reach 50,200 by 2025. The structure is 115 ft (35.1 m) long and 48 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesPr 2
CrossesPr 377
Location2.5 KM N W of Guayanilla
RouteState Highway 2
Coordinates18.03645, -66.80176
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating68.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length115 ft (35.1 m)
Longest span107 ft (32.5 m)
Deck width48 ft (14.6 m)
Roadway width45 ft (13.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic36,900 (2017)
Projected traffic50,200 by 2025
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pr 2 over Pr 377 built?

It was built in 2003, making it 22 years old in 2025.

What condition is Pr 2 over Pr 377 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Pr 2 over Pr 377 carry?

About 36,900 vehicles per day (2017 count), of which roughly 5% are trucks.

How long is Pr 2 over Pr 377?

The structure is 115 ft (35.1 m) long with a longest span of 107 ft (32.5 m) and a deck 48 ft wide.

Who owns Pr 2 over Pr 377?

It is owned by the State Highway Agency.