US Bridges

Pr 377 0.1 KM over Consejo Creek

FairPosted for load

Guayanilla Municipio, Puerto Rico · 2.5 KM N W of Guayanilla · Structure no. 011181

Built
1968
57 years old
Condition
Fair
inspected October 2024
Type
Tee Beam
Concrete Continuous
Length
60 ft
3 main spans
Daily traffic
500
2017 count
Owner
State
State Highway Agency

About this bridge

Pr 377 0.1 KM over Consejo Creek is a concrete continuous tee beam carrying Pr 377 0.1 KM over Consejo Creek in Guayanilla Municipio, Puerto Rico. It was built in 1968, so it is 57 years old, older than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 500 vehicles a day, roughly 4% of them trucks, projected to reach 700 by 2025. The structure is 60 ft (18.4 m) long and 23 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPr 377 0.1 KM
CrossesConsejo Creek
Location2.5 KM N W of Guayanilla
RouteState Highway 377
Coordinates18.03501, -66.80202
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionOctober 2024
Inspection intervalevery 12 months
Operating statusPosted for load restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating14.6 US tons
Inventory rating11.4 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length60 ft (18.4 m)
Longest span17 ft (5.3 m)
Deck width23 ft (6.9 m)
Roadway width17 ft (5.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic500 (2017)
Projected traffic700 by 2025
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$301,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Pr 377 0.1 KM over Consejo Creek built?

It was built in 1968, making it 57 years old in 2025.

What condition is Pr 377 0.1 KM over Consejo Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does Pr 377 0.1 KM over Consejo Creek carry?

About 500 vehicles per day (2017 count), of which roughly 4% are trucks.

How long is Pr 377 0.1 KM over Consejo Creek?

The structure is 60 ft (18.4 m) long with a longest span of 17 ft (5.3 m) and a deck 23 ft wide.

Who owns Pr 377 0.1 KM over Consejo Creek?

It is owned by the State Highway Agency.