Off Pr 179 at K1.5 over Guamani River
GoodGuayama Municipio, Puerto Rico · 2 Km. North of Guayama · Structure no. 024631
- Built
- 1996
- 29 years old
- Condition
- Good
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 59 ft
- 1 main span
- Daily traffic
- 3,800
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Off Pr 179 at K1.5 over Guamani River is a prestressed concrete stringer/multi-beam or girder carrying Off Pr 179 at K1.5 over Guamani River in Guayama Municipio, Puerto Rico. It was built in 1996, so it is 29 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,800 vehicles a day, roughly 2% of them trucks, projected to reach 4,900 by 2025. The structure is 59 ft (18 m) long and 32 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Off Pr 179 at K1.5 over Guamani River built?
It was built in 1996, making it 29 years old in 2025.
What condition is Off Pr 179 at K1.5 over Guamani River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does Off Pr 179 at K1.5 over Guamani River carry?
About 3,800 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Off Pr 179 at K1.5 over Guamani River?
The structure is 59 ft (18 m) long with a longest span of 55 ft (16.7 m) and a deck 32 ft wide.
Who owns Off Pr 179 at K1.5 over Guamani River?
It is owned by the City or Municipal Highway Agency.