Pr 179 1.7 KM over Guamani River
FairPosted for loadGuayama Municipio, Puerto Rico · 3 KM North of Guayama · Structure no. 005241
- Built
- 1925
- 100 years old
- Condition
- Fair
- inspected October 2024
- Type
- Tee Beam
- Concrete
- Length
- 46 ft
- 1 main span
- Daily traffic
- 3,800
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 179 1.7 KM over Guamani River is a concrete tee beam carrying Pr 179 1.7 KM over Guamani River in Guayama Municipio, Puerto Rico. It was built in 1925, so it is 100 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 3,800 vehicles a day, roughly 5% of them trucks, projected to reach 4,900 by 2025. The structure is 46 ft (14 m) long and 24 ft wide. If it were closed, the detour would be 18 mi (29 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 179 1.7 KM over Guamani River built?
It was built in 1925, making it 100 years old in 2025.
What condition is Pr 179 1.7 KM over Guamani River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Pr 179 1.7 KM over Guamani River carry?
About 3,800 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 179 1.7 KM over Guamani River?
The structure is 46 ft (14 m) long with a longest span of 46 ft (14 m) and a deck 24 ft wide.
Who owns Pr 179 1.7 KM over Guamani River?
It is owned by the State Highway Agency.