Pr 53 Soub 2.8 KM over Future Road
FairFajardo Municipio, Puerto Rico · 2.5 KM South of Fajardo · Structure no. 023022
- Built
- 1994
- 31 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 104 ft
- 1 main span
- Daily traffic
- 60,150
- 2017 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Pr 53 Soub 2.8 KM over Future Road is a prestressed concrete stringer/multi-beam or girder carrying Pr 53 Soub 2.8 KM over Future Road in Fajardo Municipio, Puerto Rico. It was built in 1994, so it is 31 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 60,150 vehicles a day, roughly 2% of them trucks, projected to reach 137,100 by 2025. The structure is 104 ft (31.7 m) long and 44 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 53 Soub 2.8 KM over Future Road built?
It was built in 1994, making it 31 years old in 2025.
What condition is Pr 53 Soub 2.8 KM over Future Road in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Pr 53 Soub 2.8 KM over Future Road carry?
About 60,150 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Pr 53 Soub 2.8 KM over Future Road?
The structure is 104 ft (31.7 m) long with a longest span of 104 ft (31.7 m) and a deck 44 ft wide.
Who owns Pr 53 Soub 2.8 KM over Future Road?
It is owned by the State Toll Authority.