US Bridges

Pr 7774 KM 0.2 over PIñAS Creek

FairPosted for load

Comerio Municipio, Puerto Rico · 1 KM South of Comerio · Structure no. 011581

Built
1969
56 years old
Condition
Fair
inspected April 2024
Type
Culvert
Concrete
Length
25 ft
2 main spans
Daily traffic
1,000
2017 count
Owner
State
State Highway Agency

About this bridge

Pr 7774 KM 0.2 over PIñAS Creek is a concrete culvert carrying Pr 7774 KM 0.2 over PIñAS Creek in Comerio Municipio, Puerto Rico. It was built in 1969, so it is 56 years old, older than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 1,000 vehicles a day, roughly 5% of them trucks, projected to reach 1,300 by 2025. The structure is 25 ft (7.6 m) long. If it were closed, the detour would be 7.5 mi (12 km).

CarriesPr 7774 KM 0.2
CrossesPIñAS Creek
Location1 KM South of Comerio
RouteState Highway 7774
Coordinates18.2122, -66.22554
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionApril 2024
Inspection intervalevery 12 months
Operating statusPosted for load restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating14.8 US tons
Inventory rating11.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadUnknown
Structure length25 ft (7.6 m)
Longest span12 ft (3.6 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2017)
Projected traffic1,300 by 2025
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed7.5 mi (12 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$105,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Pr 7774 KM 0.2 over PIñAS Creek built?

It was built in 1969, making it 56 years old in 2025.

What condition is Pr 7774 KM 0.2 over PIñAS Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Pr 7774 KM 0.2 over PIñAS Creek carry?

About 1,000 vehicles per day (2017 count), of which roughly 5% are trucks.

How long is Pr 7774 KM 0.2 over PIñAS Creek?

The structure is 25 ft (7.6 m) long with a longest span of 12 ft (3.6 m).

Who owns Pr 7774 KM 0.2 over PIñAS Creek?

It is owned by the State Highway Agency.