Pr 775 over PIñAS Creek
FairPosted for loadComerio Municipio, Puerto Rico · 0.5 KM South of Comerio · Structure no. 005391
- Built
- 1940
- 85 years old
- Condition
- Fair
- inspected May 2024
- Type
- Slab
- Concrete Continuous
- Length
- 67 ft
- 3 main spans
- Daily traffic
- 2,200
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 775 over PIñAS Creek is a concrete continuous slab carrying Pr 775 over PIñAS Creek in Comerio Municipio, Puerto Rico. It was built in 1940, so it is 85 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 2,200 vehicles a day, roughly 5% of them trucks, projected to reach 3,200 by 2025. The structure is 67 ft (20.3 m) long and 23 ft wide. If it were closed, the detour would be 7.5 mi (12 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 775 over PIñAS Creek built?
It was built in 1940, making it 85 years old in 2025.
What condition is Pr 775 over PIñAS Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Pr 775 over PIñAS Creek carry?
About 2,200 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 775 over PIñAS Creek?
The structure is 67 ft (20.3 m) long with a longest span of 20 ft (6.1 m) and a deck 23 ft wide.
Who owns Pr 775 over PIñAS Creek?
It is owned by the State Highway Agency.