US Bridges

Pr 123 67.45 KM over Waterway

FairPosted for load

Arecibo Municipio, Puerto Rico · 20 KM S E of Arecibo · Structure no. 012311

Built
1940
85 years old
Condition
Fair
inspected August 2024
Type
Slab
Concrete
Length
23 ft
1 main span
Daily traffic
3,500
2017 count
Owner
State
State Highway Agency

About this bridge

Pr 123 67.45 KM over Waterway is a concrete slab carrying Pr 123 67.45 KM over Waterway in Arecibo Municipio, Puerto Rico. It was built in 1940, so it is 85 years old, older than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 3,500 vehicles a day, roughly 4% of them trucks, projected to reach 4,500 by 2025. The structure is 23 ft (7.1 m) long and 26 ft wide. If it were closed, the detour would be 22.4 mi (36 km).

CarriesPr 123 67.45 KM
CrossesWaterway
Location20 KM S E of Arecibo
RouteState Highway 123
Coordinates18.32685, -66.67147
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 12 months
Operating statusPosted for load restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating29 US tons
Inventory rating17.6 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length23 ft (7.1 m)
Longest span20 ft (6.1 m)
Deck width26 ft (7.9 m)
Roadway width22 ft (6.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,500 (2017)
Projected traffic4,500 by 2025
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed22.4 mi (36 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$140,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Pr 123 67.45 KM over Waterway built?

It was built in 1940, making it 85 years old in 2025.

What condition is Pr 123 67.45 KM over Waterway in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Pr 123 67.45 KM over Waterway carry?

About 3,500 vehicles per day (2017 count), of which roughly 4% are trucks.

How long is Pr 123 67.45 KM over Waterway?

The structure is 23 ft (7.1 m) long with a longest span of 20 ft (6.1 m) and a deck 26 ft wide.

Who owns Pr 123 67.45 KM over Waterway?

It is owned by the State Highway Agency.