Off Pr 725 KM 2.6 over Rio Aibonito
PoorAibonito Municipio, Puerto Rico · Aibonito · Structure no. 031311
- Built
- 2010
- 15 years old
- Condition
- Poor
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 51 ft
- 1 main span
- Daily traffic
- 8,900
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Off Pr 725 KM 2.6 over Rio Aibonito is a steel stringer/multi-beam or girder carrying Off Pr 725 KM 2.6 over Rio Aibonito in Aibonito Municipio, Puerto Rico. It was built in 2010, so it is 15 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 8,900 vehicles a day, projected to reach 12,800 by 2025. The structure is 51 ft (15.6 m) long and 23 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
| Channel and channel protection | 2 Critical | Advanced deterioration of primary structural elements. Bridge may be closed until corrective action is taken. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Off Pr 725 KM 2.6 over Rio Aibonito built?
It was built in 2010, making it 15 years old in 2025.
What condition is Off Pr 725 KM 2.6 over Rio Aibonito in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in August 2024.
How much traffic does Off Pr 725 KM 2.6 over Rio Aibonito carry?
About 8,900 vehicles per day (2017 count).
How long is Off Pr 725 KM 2.6 over Rio Aibonito?
The structure is 51 ft (15.6 m) long with a longest span of 49 ft (15 m) and a deck 23 ft wide.
Who owns Off Pr 725 KM 2.6 over Rio Aibonito?
It is owned by the City or Municipal Highway Agency.