Pr 725 4.2 KM over Aibonito River
PoorPosted for loadAibonito Municipio, Puerto Rico · 2 KM N W of Aibonito · Structure no. 009041
- Built
- 1970
- 55 years old
- Condition
- Poor
- inspected June 2024
- Type
- Slab
- Concrete Continuous
- Length
- 81 ft
- 3 main spans
- Daily traffic
- 8,900
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 725 4.2 KM over Aibonito River is a concrete continuous slab carrying Pr 725 4.2 KM over Aibonito River in Aibonito Municipio, Puerto Rico. It was built in 1970, so it is 55 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 8,900 vehicles a day, roughly 5% of them trucks, projected to reach 12,800 by 2025. The structure is 81 ft (24.6 m) long and 22 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 725 4.2 KM over Aibonito River built?
It was built in 1970, making it 55 years old in 2025.
What condition is Pr 725 4.2 KM over Aibonito River in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in June 2024.
How much traffic does Pr 725 4.2 KM over Aibonito River carry?
About 8,900 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 725 4.2 KM over Aibonito River?
The structure is 81 ft (24.6 m) long with a longest span of 29 ft (8.7 m) and a deck 22 ft wide.
Who owns Pr 725 4.2 KM over Aibonito River?
It is owned by the State Highway Agency.