Ramp a Off Ramp over Schuylkill River Bank
FairPhiladelphia County, Pennsylvania · 76WB Rmp.Chestnut 3590A09 · Structure no. 000000000039368
- Built
- 1955
- 70 years old, rebuilt 1984
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 425 ft
- 12 main spans
- Daily traffic
- 13,118
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Ramp a Off Ramp over Schuylkill River Bank is a steel stringer/multi-beam or girder carrying Ramp a Off Ramp over Schuylkill River Bank in Philadelphia County, Pennsylvania. It was built in 1955 and reconstructed in 1984, so it is 70 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 13,118 vehicles a day, roughly 7% of them trucks, projected to reach 8,810 by 2032. The structure is 425 ft (129.5 m) long and 30 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ramp a Off Ramp over Schuylkill River Bank built?
It was built in 1955, making it 70 years old in 2025. It was reconstructed in 1984.
What condition is Ramp a Off Ramp over Schuylkill River Bank in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Ramp a Off Ramp over Schuylkill River Bank carry?
About 13,118 vehicles per day (2024 count), of which roughly 7% are trucks.
How long is Ramp a Off Ramp over Schuylkill River Bank?
The structure is 425 ft (129.5 m) long with a longest span of 35 ft (10.7 m) and a deck 30 ft wide.
Who owns Ramp a Off Ramp over Schuylkill River Bank?
It is owned by the State Highway Agency.