US Bridges

Summit Avenue over SEPTA (chestnut Hill E.)

Good

Philadelphia County, Pennsylvania · S of Stenton Avenue 16K02 · Structure no. 000000000039212

Built
1883
142 years old, rebuilt 1987
Condition
Good
inspected August 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
42 ft
1 main span
Daily traffic
1,100
1981 count
Owner
City
City or Municipal Highway Agency

About this bridge

Summit Avenue over SEPTA (chestnut Hill E.) is a prestressed concrete box beam or girders - multiple carrying Summit Avenue over SEPTA (chestnut Hill E.) in Philadelphia County, Pennsylvania. It was built in 1883 and reconstructed in 1987, so it is 142 years old, older than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,100 vehicles a day, projected to reach 1,400 by 2003. The structure is 42 ft (12.8 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSummit Avenue
CrossesSEPTA (chestnut Hill E.)
LocationS of Stenton Avenue 16K02
RouteCity Street 0
Coordinates40.08054, -75.20534
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating42 US tons
Inventory rating32 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length42 ft (12.8 m)
Longest span40 ft (12.2 m)
Deck width50 ft (15.3 m)
Roadway width30 ft (9.2 m)
Vertical clearance over deck25 ft (7.6 m)

Traffic and service

Average daily traffic1,100 (1981)
Projected traffic1,400 by 2003
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$801,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was Summit Avenue over SEPTA (chestnut Hill E.) built?

It was built in 1883, making it 142 years old in 2025. It was reconstructed in 1987.

What condition is Summit Avenue over SEPTA (chestnut Hill E.) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Summit Avenue over SEPTA (chestnut Hill E.) carry?

About 1,100 vehicles per day (1981 count).

How long is Summit Avenue over SEPTA (chestnut Hill E.)?

The structure is 42 ft (12.8 m) long with a longest span of 40 ft (12.2 m) and a deck 50 ft wide.

Who owns Summit Avenue over SEPTA (chestnut Hill E.)?

It is owned by the City or Municipal Highway Agency.