Girard Avenue over Schuyl. River & Kelly DR
FairPhiladelphia County, Pennsylvania · Fairmount Park 3589K04 · Structure no. 000000000038389
- Built
- 1972
- 53 years old
- Condition
- Fair
- inspected April 2024
- Type
- Frame
- Steel
- Length
- 735 ft
- 3 main spans
- Daily traffic
- 46,311
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Girard Avenue over Schuyl. River & Kelly DR is a steel frame carrying Girard Avenue over Schuyl. River & Kelly DR in Philadelphia County, Pennsylvania. It was built in 1972, so it is 53 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 46,311 vehicles a day, roughly 6% of them trucks, projected to reach 37,799 by 2032. The structure is 735 ft (224 m) long and 101 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Girard Avenue over Schuyl. River & Kelly DR built?
It was built in 1972, making it 53 years old in 2025.
What condition is Girard Avenue over Schuyl. River & Kelly DR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Girard Avenue over Schuyl. River & Kelly DR carry?
About 46,311 vehicles per day (2024 count), of which roughly 6% are trucks.
How long is Girard Avenue over Schuyl. River & Kelly DR?
The structure is 735 ft (224 m) long with a longest span of 197 ft (60 m) and a deck 101 ft wide.
Who owns Girard Avenue over Schuyl. River & Kelly DR?
It is owned by the State Highway Agency.