I-80 WB over Over SR254/LIMESTONE Run
FairNorthumberland County, Pennsylvania · Limestoneville Exit · Structure no. 000000000029024
- Built
- 1962
- 63 years old, rebuilt 1996
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 288 ft
- 4 main spans
- Daily traffic
- 13,626
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-80 WB over Over SR254/LIMESTONE Run is a prestressed concrete stringer/multi-beam or girder carrying I-80 WB over Over SR254/LIMESTONE Run in Northumberland County, Pennsylvania. It was built in 1962 and reconstructed in 1996, so it is 63 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 13,626 vehicles a day, roughly 38% of them trucks, projected to reach 19,130 by 2032. The structure is 288 ft (87.8 m) long and 38 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-80 WB over Over SR254/LIMESTONE Run built?
It was built in 1962, making it 63 years old in 2025. It was reconstructed in 1996.
What condition is I-80 WB over Over SR254/LIMESTONE Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does I-80 WB over Over SR254/LIMESTONE Run carry?
About 13,626 vehicles per day (2024 count), of which roughly 38% are trucks.
How long is I-80 WB over Over SR254/LIMESTONE Run?
The structure is 288 ft (87.8 m) long with a longest span of 93 ft (28.3 m) and a deck 38 ft wide.
Who owns I-80 WB over Over SR254/LIMESTONE Run?
It is owned by the State Highway Agency.