US Bridges

Dekalb Street over Norfolk Southern

Good

Montgomery County, Pennsylvania · S.Schuylkill River 3367D3 · Structure no. 000000000044485

Built
2009
16 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
313 ft
5 main spans
Daily traffic
17,486
2023 count
Owner
State
State Highway Agency

About this bridge

Dekalb Street over Norfolk Southern is a steel continuous stringer/multi-beam or girder carrying Dekalb Street over Norfolk Southern in Montgomery County, Pennsylvania. It was built in 2009, so it is 16 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 17,486 vehicles a day, roughly 6% of them trucks, projected to reach 20,345 by 2032. The structure is 313 ft (95.4 m) long and 56 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesDekalb Street
CrossesNorfolk Southern
LocationS.Schuylkill River 3367D3
RouteU.S. Route 202
Coordinates40.10639, -75.34639
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment7: Better than present minimum criteria
Operating rating79 US tons
Inventory rating47 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans5
Design loadHL 93
Structure length313 ft (95.4 m)
Longest span308 ft (93.9 m)
Deck width56 ft (17.2 m)
Roadway width46 ft (14 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,486 (2023)
Projected traffic20,345 by 2032
Trucks6%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Dekalb Street over Norfolk Southern built?

It was built in 2009, making it 16 years old in 2025.

What condition is Dekalb Street over Norfolk Southern in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Dekalb Street over Norfolk Southern carry?

About 17,486 vehicles per day (2023 count), of which roughly 6% are trucks.

How long is Dekalb Street over Norfolk Southern?

The structure is 313 ft (95.4 m) long with a longest span of 308 ft (93.9 m) and a deck 56 ft wide.

Who owns Dekalb Street over Norfolk Southern?

It is owned by the State Highway Agency.