S 202 - Ramp R over Schuylkill Parkway
FairMontgomery County, Pennsylvania · Bridgeport 28J10/3367D4 · Structure no. 000000000027587
- Built
- 1972
- 53 years old
- Condition
- Fair
- inspected November 2022
- Type
- Girder and Floorbeam System
- Steel
- Length
- 217 ft
- 3 main spans
- Daily traffic
- 613
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
S 202 - Ramp R over Schuylkill Parkway is a steel girder and floorbeam system carrying S 202 - Ramp R over Schuylkill Parkway in Montgomery County, Pennsylvania. It was built in 1972, so it is 53 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 613 vehicles a day, roughly 50% of them trucks, projected to reach 1,468 by 2032. The structure is 217 ft (66.1 m) long and 34 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S 202 - Ramp R over Schuylkill Parkway built?
It was built in 1972, making it 53 years old in 2025.
What condition is S 202 - Ramp R over Schuylkill Parkway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2022.
How much traffic does S 202 - Ramp R over Schuylkill Parkway carry?
About 613 vehicles per day (2024 count), of which roughly 50% are trucks.
How long is S 202 - Ramp R over Schuylkill Parkway?
The structure is 217 ft (66.1 m) long with a longest span of 132 ft (40.2 m) and a deck 34 ft wide.
Who owns S 202 - Ramp R over Schuylkill Parkway?
It is owned by the State Highway Agency.