P-Town X-Way (wb) over Upper Indian Head Road
FairMontgomery County, Pennsylvania · N. of Oaks 27D3/3253H8 · Structure no. 000000000027442
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected December 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 161 ft
- 3 main spans
- Daily traffic
- 33,727
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
P-Town X-Way (wb) over Upper Indian Head Road is a prestressed concrete stringer/multi-beam or girder carrying P-Town X-Way (wb) over Upper Indian Head Road in Montgomery County, Pennsylvania. It was built in 1984, so it is 41 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 33,727 vehicles a day, roughly 6% of them trucks, projected to reach 39,838 by 2032. The structure is 161 ft (49.1 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was P-Town X-Way (wb) over Upper Indian Head Road built?
It was built in 1984, making it 41 years old in 2025.
What condition is P-Town X-Way (wb) over Upper Indian Head Road in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2022.
How much traffic does P-Town X-Way (wb) over Upper Indian Head Road carry?
About 33,727 vehicles per day (2024 count), of which roughly 6% are trucks.
How long is P-Town X-Way (wb) over Upper Indian Head Road?
The structure is 161 ft (49.1 m) long with a longest span of 76 ft (23.2 m) and a deck 46 ft wide.
Who owns P-Town X-Way (wb) over Upper Indian Head Road?
It is owned by the State Highway Agency.