SR 2030(LR 776) over SR 2028(LR 166)
GoodMonroe County, Pennsylvania · Del.Water Gap Int Pa 611 · Structure no. 000000000047998
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 96 ft
- 1 main span
- Daily traffic
- 2,363
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 2030(LR 776) over SR 2028(LR 166) is a prestressed concrete stringer/multi-beam or girder carrying SR 2030(LR 776) over SR 2028(LR 166) in Monroe County, Pennsylvania. It was built in 2013, so it is 12 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,363 vehicles a day, roughly 9% of them trucks, projected to reach 2 by 2020. The structure is 96 ft (29.3 m) long and 72 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 2030(LR 776) over SR 2028(LR 166) built?
It was built in 2013, making it 12 years old in 2025.
What condition is SR 2030(LR 776) over SR 2028(LR 166) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does SR 2030(LR 776) over SR 2028(LR 166) carry?
About 2,363 vehicles per day (2023 count), of which roughly 9% are trucks.
How long is SR 2030(LR 776) over SR 2028(LR 166)?
The structure is 96 ft (29.3 m) long with a longest span of 95 ft (29 m) and a deck 72 ft wide.
Who owns SR 2030(LR 776) over SR 2028(LR 166)?
It is owned by the State Highway Agency.