US Bridges

SR 2101 Hartwick R over Over SR 80 Eb/Wb

Good

Mercer County, Pennsylvania · Findley Township · Structure no. 000000000025802

Built
1965
60 years old
Condition
Good
inspected September 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
225 ft
5 main spans
Daily traffic
229
2024 count
Owner
State
State Highway Agency

About this bridge

SR 2101 Hartwick R over Over SR 80 Eb/Wb is a prestressed concrete box beam or girders - multiple carrying SR 2101 Hartwick R over Over SR 80 Eb/Wb in Mercer County, Pennsylvania. It was built in 1965, so it is 60 years old, older than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 229 vehicles a day, roughly 4% of them trucks, projected to reach 550 by 2032. The structure is 225 ft (68.6 m) long and 33 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesSR 2101 Hartwick R
CrossesOver SR 80 Eb/Wb
LocationFindley Township
RouteState Highway 0
Coordinates41.1981, -80.14738
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating61.9 US tons
Inventory rating23 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length225 ft (68.6 m)
Longest span57 ft (17.4 m)
Deck width33 ft (10.2 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic229 (2024)
Projected traffic550 by 2032
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedDeck rehabilitation with only incidental widening
Estimated improvement cost$253,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 2101 Hartwick R over Over SR 80 Eb/Wb built?

It was built in 1965, making it 60 years old in 2025.

What condition is SR 2101 Hartwick R over Over SR 80 Eb/Wb in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does SR 2101 Hartwick R over Over SR 80 Eb/Wb carry?

About 229 vehicles per day (2024 count), of which roughly 4% are trucks.

How long is SR 2101 Hartwick R over Over SR 80 Eb/Wb?

The structure is 225 ft (68.6 m) long with a longest span of 57 ft (17.4 m) and a deck 33 ft wide.

Who owns SR 2101 Hartwick R over Over SR 80 Eb/Wb?

It is owned by the State Highway Agency.