SR 58 Grove City over Over SR 80 Eb/Wb Zh Con
FairMercer County, Pennsylvania · Findley Township · Structure no. 000000000025677
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected August 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 378 ft
- 5 main spans
- Daily traffic
- 5,388
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 58 Grove City over Over SR 80 Eb/Wb Zh Con is a prestressed concrete box beam or girders - multiple carrying SR 58 Grove City over Over SR 80 Eb/Wb Zh Con in Mercer County, Pennsylvania. It was built in 1965, so it is 60 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,388 vehicles a day, roughly 5% of them trucks, projected to reach 6,120 by 2032. The structure is 378 ft (115.2 m) long and 66 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 58 Grove City over Over SR 80 Eb/Wb Zh Con built?
It was built in 1965, making it 60 years old in 2025.
What condition is SR 58 Grove City over Over SR 80 Eb/Wb Zh Con in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does SR 58 Grove City over Over SR 80 Eb/Wb Zh Con carry?
About 5,388 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is SR 58 Grove City over Over SR 80 Eb/Wb Zh Con?
The structure is 378 ft (115.2 m) long with a longest span of 94 ft (28.7 m) and a deck 66 ft wide.
Who owns SR 58 Grove City over Over SR 80 Eb/Wb Zh Con?
It is owned by the State Highway Agency.