SR 0220 NB over Over T-331
FairLycoming County, Pennsylvania · 2.5 MI West Newberry · Structure no. 000000000024695
- Built
- 1971
- 54 years old, rebuilt 2001
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 89 ft
- 1 main span
- Daily traffic
- 8,568
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 0220 NB over Over T-331 is a prestressed concrete stringer/multi-beam or girder carrying SR 0220 NB over Over T-331 in Lycoming County, Pennsylvania. It was built in 1971 and reconstructed in 2001, so it is 54 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,568 vehicles a day, roughly 14% of them trucks, projected to reach 13,525 by 2032. The structure is 89 ft (27.1 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 0220 NB over Over T-331 built?
It was built in 1971, making it 54 years old in 2025. It was reconstructed in 2001.
What condition is SR 0220 NB over Over T-331 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does SR 0220 NB over Over T-331 carry?
About 8,568 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is SR 0220 NB over Over T-331?
The structure is 89 ft (27.1 m) long with a longest span of 84 ft (25.6 m) and a deck 43 ft wide.
Who owns SR 0220 NB over Over T-331?
It is owned by the State Highway Agency.