SR 309 over Courtdale Ave
FairLuzerne County, Pennsylvania · Courtdale Bo over SR 1002 · Structure no. 000000000023890
- Built
- 1980
- 45 years old, rebuilt 2020
- Condition
- Fair
- inspected November 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 185 ft
- 3 main spans
- Daily traffic
- 32,542
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 309 over Courtdale Ave is a prestressed concrete stringer/multi-beam or girder carrying SR 309 over Courtdale Ave in Luzerne County, Pennsylvania. It was built in 1980 and reconstructed in 2020, so it is 45 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 32,542 vehicles a day, roughly 4% of them trucks, projected to reach 45,697 by 2032. The structure is 185 ft (56.4 m) long and 95 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 309 over Courtdale Ave built?
It was built in 1980, making it 45 years old in 2025. It was reconstructed in 2020.
What condition is SR 309 over Courtdale Ave in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2022.
How much traffic does SR 309 over Courtdale Ave carry?
About 32,542 vehicles per day (2024 count), of which roughly 4% are trucks.
How long is SR 309 over Courtdale Ave?
The structure is 185 ft (56.4 m) long with a longest span of 88 ft (26.8 m) and a deck 95 ft wide.
Who owns SR 309 over Courtdale Ave?
It is owned by the State Highway Agency.