US Bridges

Buckingham ST over Toby Creek

Fair

Luzerne County, Pennsylvania · At SR 1013 Intersect · Structure no. 000000000024471

Built
1980
45 years old
Condition
Fair
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
39 ft
1 main span
Daily traffic
2,400
2018 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Buckingham ST over Toby Creek is a steel stringer/multi-beam or girder carrying Buckingham ST over Toby Creek in Luzerne County, Pennsylvania. It was built in 1980, so it is 45 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,400 vehicles a day, roughly 2% of them trucks, projected to reach 3,200 by 2036. The structure is 39 ft (11.9 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBuckingham ST
CrossesToby Creek
LocationAt SR 1013 Intersect
RouteCity Street 0
Coordinates41.28208, -75.89553
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating80 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length39 ft (11.9 m)
Longest span38 ft (11.6 m)
Deck width44 ft (13.3 m)
Roadway width31 ft (9.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,400 (2018)
Projected traffic3,200 by 2036
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$35,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Buckingham ST over Toby Creek built?

It was built in 1980, making it 45 years old in 2025.

What condition is Buckingham ST over Toby Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Buckingham ST over Toby Creek carry?

About 2,400 vehicles per day (2018 count), of which roughly 2% are trucks.

How long is Buckingham ST over Toby Creek?

The structure is 39 ft (11.9 m) long with a longest span of 38 ft (11.6 m) and a deck 44 ft wide.

Who owns Buckingham ST over Toby Creek?

It is owned by the Town or Township Highway Agency.