SR 0380 I-380 NB over SR 2013
FairLackawanna County, Pennsylvania · Clifton Twp over SR 2013 · Structure no. 000000000020596
- Built
- 1967
- 58 years old, rebuilt 2009
- Condition
- Fair
- inspected September 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 115 ft
- 3 main spans
- Daily traffic
- 11,704
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 0380 I-380 NB over SR 2013 is a prestressed concrete box beam or girders - multiple carrying SR 0380 I-380 NB over SR 2013 in Lackawanna County, Pennsylvania. It was built in 1967 and reconstructed in 2009, so it is 58 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,704 vehicles a day, roughly 21% of them trucks, projected to reach 16,519 by 2032. The structure is 115 ft (35.1 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 0380 I-380 NB over SR 2013 built?
It was built in 1967, making it 58 years old in 2025. It was reconstructed in 2009.
What condition is SR 0380 I-380 NB over SR 2013 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does SR 0380 I-380 NB over SR 2013 carry?
About 11,704 vehicles per day (2024 count), of which roughly 21% are trucks.
How long is SR 0380 I-380 NB over SR 2013?
The structure is 115 ft (35.1 m) long with a longest span of 43 ft (13.1 m) and a deck 43 ft wide.
Who owns SR 0380 I-380 NB over SR 2013?
It is owned by the State Highway Agency.