US Bridges

SR 2033 over Soldier Run

Good

Jefferson County, Pennsylvania · 210FT S SR 322 Intersect · Structure no. 000000000067846

Built
2022
3 years old
Condition
Good
inspected July 2024
Type
Culvert
Concrete
Length
36 ft
1 main span
Daily traffic
93
2023 count
Owner
State
State Highway Agency

About this bridge

SR 2033 over Soldier Run is a concrete culvert carrying SR 2033 over Soldier Run in Jefferson County, Pennsylvania. It was built in 2022, so it is 3 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 93 vehicles a day, roughly 6% of them trucks, projected to reach 181 by 2032. The structure is 36 ft (11 m) long and 29 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesSR 2033
CrossesSoldier Run
Location210FT S SR 322 Intersect
RouteState Highway 0
Coordinates41.09302, -78.83965
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.2 US tons
Inventory rating47.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length36 ft (11 m)
Longest span33 ft (10.1 m)
Deck width29 ft (8.8 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic93 (2023)
Projected traffic181 by 2032
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 2033 over Soldier Run built?

It was built in 2022, making it 3 years old in 2025.

What condition is SR 2033 over Soldier Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does SR 2033 over Soldier Run carry?

About 93 vehicles per day (2023 count), of which roughly 6% are trucks.

How long is SR 2033 over Soldier Run?

The structure is 36 ft (11 m) long with a longest span of 33 ft (10.1 m) and a deck 29 ft wide.

Who owns SR 2033 over Soldier Run?

It is owned by the State Highway Agency.