SR0322 over Soldier Run
FairJefferson County, Pennsylvania · Prescottville NO.3 · Structure no. 000000000019642
- Built
- 1927
- 98 years old, rebuilt 1998
- Condition
- Fair
- inspected June 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 58 ft
- 2 main spans
- Daily traffic
- 3,897
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR0322 over Soldier Run is a prestressed concrete box beam or girders - multiple carrying SR0322 over Soldier Run in Jefferson County, Pennsylvania. It was built in 1927 and reconstructed in 1998, so it is 98 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,897 vehicles a day, roughly 14% of them trucks, projected to reach 5,235 by 2032. The structure is 58 ft (17.7 m) long and 41 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR0322 over Soldier Run built?
It was built in 1927, making it 98 years old in 2025. It was reconstructed in 1998.
What condition is SR0322 over Soldier Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does SR0322 over Soldier Run carry?
About 3,897 vehicles per day (2024 count), of which roughly 14% are trucks.
How long is SR0322 over Soldier Run?
The structure is 58 ft (17.7 m) long with a longest span of 26 ft (7.9 m) and a deck 41 ft wide.
Who owns SR0322 over Soldier Run?
It is owned by the State Highway Agency.