T-338 Mckee RD over Over SR 90 Eb/Wb
GoodErie County, Pennsylvania · Springfield Township · Structure no. 000000000068733
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 205 ft
- 2 main spans
- Daily traffic
- 62
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
T-338 Mckee RD over Over SR 90 Eb/Wb is a prestressed concrete stringer/multi-beam or girder carrying T-338 Mckee RD over Over SR 90 Eb/Wb in Erie County, Pennsylvania. It was built in 2022, so it is 3 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 62 vehicles a day, roughly 11% of them trucks, projected to reach 71 by 2032. The structure is 205 ft (62.5 m) long and 31 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T-338 Mckee RD over Over SR 90 Eb/Wb built?
It was built in 2022, making it 3 years old in 2025.
What condition is T-338 Mckee RD over Over SR 90 Eb/Wb in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does T-338 Mckee RD over Over SR 90 Eb/Wb carry?
About 62 vehicles per day (2024 count), of which roughly 11% are trucks.
How long is T-338 Mckee RD over Over SR 90 Eb/Wb?
The structure is 205 ft (62.5 m) long with a longest span of 101 ft (30.8 m) and a deck 31 ft wide.
Who owns T-338 Mckee RD over Over SR 90 Eb/Wb?
It is owned by the State Highway Agency.