US Bridges

SR 215 Church ST over Over SR 90 Eb/Wb

Good

Erie County, Pennsylvania · Springfield Township · Structure no. 000000000068380

Built
2021
4 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Concrete Continuous
Length
192 ft
2 main spans
Daily traffic
1,228
2024 count
Owner
State
State Highway Agency

About this bridge

SR 215 Church ST over Over SR 90 Eb/Wb is a concrete continuous stringer/multi-beam or girder carrying SR 215 Church ST over Over SR 90 Eb/Wb in Erie County, Pennsylvania. It was built in 2021, so it is 4 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,228 vehicles a day, roughly 5% of them trucks, projected to reach 1,814 by 2032. The structure is 192 ft (58.5 m) long and 43 ft wide. If it were closed, the detour would be 11.8 mi (19 km).

CarriesSR 215 Church ST
CrossesOver SR 90 Eb/Wb
LocationSpringfield Township
RouteState Highway 215
Coordinates41.94503, -80.40222
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.8 US tons
Inventory rating36.8 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length192 ft (58.5 m)
Longest span95 ft (29 m)
Deck width43 ft (13.2 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,228 (2024)
Projected traffic1,814 by 2032
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed11.8 mi (19 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 215 Church ST over Over SR 90 Eb/Wb built?

It was built in 2021, making it 4 years old in 2025.

What condition is SR 215 Church ST over Over SR 90 Eb/Wb in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does SR 215 Church ST over Over SR 90 Eb/Wb carry?

About 1,228 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is SR 215 Church ST over Over SR 90 Eb/Wb?

The structure is 192 ft (58.5 m) long with a longest span of 95 ft (29 m) and a deck 43 ft wide.

Who owns SR 215 Church ST over Over SR 90 Eb/Wb?

It is owned by the State Highway Agency.