SR 90 WB over Over Allegheny Railroad
GoodErie County, Pennsylvania · Summit Township · Structure no. 000000000016068
- Built
- 1996
- 29 years old
- Condition
- Good
- inspected August 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 126 ft
- 1 main span
- Daily traffic
- 21,450
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 90 WB over Over Allegheny Railroad is a prestressed concrete box beam or girders - multiple carrying SR 90 WB over Over Allegheny Railroad in Erie County, Pennsylvania. It was built in 1996, so it is 29 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 21,450 vehicles a day, roughly 21% of them trucks, projected to reach 21,602 by 2032. The structure is 126 ft (38.4 m) long and 46 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 90 WB over Over Allegheny Railroad built?
It was built in 1996, making it 29 years old in 2025.
What condition is SR 90 WB over Over Allegheny Railroad in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does SR 90 WB over Over Allegheny Railroad carry?
About 21,450 vehicles per day (2024 count), of which roughly 21% are trucks.
How long is SR 90 WB over Over Allegheny Railroad?
The structure is 126 ft (38.4 m) long with a longest span of 120 ft (36.6 m) and a deck 46 ft wide.
Who owns SR 90 WB over Over Allegheny Railroad?
It is owned by the State Highway Agency.