US Bridges

Ramp a over 2nd ST Front & Reaney ST

Good

Delaware County, Pennsylvania · Comm. Barry Brdg 3806K07 · Structure no. 000000000045384

Built
2011
14 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
1,360 ft
8 main spans
Daily traffic
4,125
2024 count
Owner
State
State Highway Agency

About this bridge

Ramp a over 2nd ST Front & Reaney ST is a steel continuous stringer/multi-beam or girder carrying Ramp a over 2nd ST Front & Reaney ST in Delaware County, Pennsylvania. It was built in 2011, so it is 14 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,125 vehicles a day, roughly 10% of them trucks, projected to reach 375 by 2032. The structure is 1,360 ft (414.5 m) long and 32 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesRamp a
Crosses2nd ST Front & Reaney ST
LocationComm. Barry Brdg 3806K07
RouteState Highway 0
Coordinates39.83361, -75.38041
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating79 US tons
Inventory rating47 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans8
Design loadHS 25 or greater
Structure length1,360 ft (414.5 m)
Longest span195 ft (59.4 m)
Deck width32 ft (9.9 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,125 (2024)
Projected traffic375 by 2032
Trucks10%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp a over 2nd ST Front & Reaney ST built?

It was built in 2011, making it 14 years old in 2025.

What condition is Ramp a over 2nd ST Front & Reaney ST in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Ramp a over 2nd ST Front & Reaney ST carry?

About 4,125 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Ramp a over 2nd ST Front & Reaney ST?

The structure is 1,360 ft (414.5 m) long with a longest span of 195 ft (59.4 m) and a deck 32 ft wide.

Who owns Ramp a over 2nd ST Front & Reaney ST?

It is owned by the State Highway Agency.