Ramp B Comm Barry over Seventh Street
FairDelaware County, Pennsylvania · Ramp B Comm Barry 43D06 · Structure no. 000000000015450
- Built
- 1974
- 51 years old
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 535 ft
- 5 main spans
- Daily traffic
- 4,555
- 2009 count
- Owner
- Toll Authority
- Local Toll Authority
About this bridge
Ramp B Comm Barry over Seventh Street is a steel stringer/multi-beam or girder carrying Ramp B Comm Barry over Seventh Street in Delaware County, Pennsylvania. It was built in 1974, so it is 51 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,555 vehicles a day, roughly 10% of them trucks, projected to reach 5,558 by 2029. The structure is 535 ft (163.1 m) long and 23 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ramp B Comm Barry over Seventh Street built?
It was built in 1974, making it 51 years old in 2025.
What condition is Ramp B Comm Barry over Seventh Street in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Ramp B Comm Barry over Seventh Street carry?
About 4,555 vehicles per day (2009 count), of which roughly 10% are trucks.
How long is Ramp B Comm Barry over Seventh Street?
The structure is 535 ft (163.1 m) long with a longest span of 107 ft (32.6 m) and a deck 23 ft wide.
Who owns Ramp B Comm Barry over Seventh Street?
It is owned by the Local Toll Authority.