Incinerator Drive over Spring Creek
FairDauphin County, Pennsylvania · Spring Cr/Incinor Dr/Hbg · Structure no. 000000000014731
- Built
- 1969
- 56 years old
- Condition
- Fair
- inspected September 2023
- Type
- Slab
- Concrete
- Length
- 72 ft
- 2 main spans
- Daily traffic
- 700
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Incinerator Drive over Spring Creek is a concrete slab carrying Incinerator Drive over Spring Creek in Dauphin County, Pennsylvania. It was built in 1969, so it is 56 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 700 vehicles a day, roughly 71% of them trucks, projected to reach 840 by 2043. The structure is 72 ft (21.9 m) long and 44 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Incinerator Drive over Spring Creek built?
It was built in 1969, making it 56 years old in 2025.
What condition is Incinerator Drive over Spring Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does Incinerator Drive over Spring Creek carry?
About 700 vehicles per day (2023 count), of which roughly 71% are trucks.
How long is Incinerator Drive over Spring Creek?
The structure is 72 ft (21.9 m) long with a longest span of 35 ft (10.7 m) and a deck 44 ft wide.
Who owns Incinerator Drive over Spring Creek?
It is owned by the City or Municipal Highway Agency.