US Bridges

T 413 Pipeline Roa over Trib to Doubling Gap

Good

Cumberland County, Pennsylvania · 6 MI N of Newville · Structure no. 000000000070290

Built
2023
2 years old
Condition
Good
inspected January 2024
Type
Culvert
Concrete
Length
24 ft
1 main span
Daily traffic
100
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T 413 Pipeline Roa over Trib to Doubling Gap is a concrete culvert carrying T 413 Pipeline Roa over Trib to Doubling Gap in Cumberland County, Pennsylvania. It was built in 2023, so it is 2 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 5% of them trucks, projected to reach 150 by 2043. The structure is 24 ft (7.3 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesT 413 Pipeline Roa
CrossesTrib to Doubling Gap
Location6 MI N of Newville
RouteCity Street 0
Coordinates40.25833, -77.44083
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert9 ExcellentNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating84 US tons
Inventory rating65 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length24 ft (7.3 m)
Longest span24 ft (7.3 m)
Deck width24 ft (7.3 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2023)
Projected traffic150 by 2043
Trucks5%
Lanes on structure2
Traffic directionHighway traffic not carried
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T 413 Pipeline Roa over Trib to Doubling Gap built?

It was built in 2023, making it 2 years old in 2025.

What condition is T 413 Pipeline Roa over Trib to Doubling Gap in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does T 413 Pipeline Roa over Trib to Doubling Gap carry?

About 100 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is T 413 Pipeline Roa over Trib to Doubling Gap?

The structure is 24 ft (7.3 m) long with a longest span of 24 ft (7.3 m) and a deck 24 ft wide.

Who owns T 413 Pipeline Roa over Trib to Doubling Gap?

It is owned by the Town or Township Highway Agency.